The residents of Tessenei town have been called upon to ensure the continuity of potable water supply facility put in place in 2013 at over 114 million Nakfa through practicing prudent utilization.
Tessenei, 21 March 2015 – The residents of Tessenei town have been called upon to ensure the continuity of potable water supply facility put in place in 2013 at over 114 million Nakfa through practicing prudent utilization.
Mr. Osman Hassen, head of water distribution in Tessenei sub-zone, pointed out that the number of beneficiaries of the scheme has witnessed visible growth.
He further noted that water consumption is on the rise in the city, and stressed the need for judicious utilization of the facility.