The inhabitants of She’ib-Seleba, Elaberid sub-zone, expressed satisfaction with the provision of reliable water supply project. Elaberid, 23 September 2011 – The inhabitants of She’ib-Seleba, Elaberid sub-zone, expressed satisfaction with the provision of reliable water supply project.
They said that previously they had to travel long distance to obtain water that was not even up to standard.
The Administrator of She’ib-Seleba, Mr. Ibrahim Sied, said that the water supply facilitated includes a well, four water stations and a water reservoir with a capacity of holding 300 barrels.