As part of the bridge construction program, this year a bridge was built over the country’s largest river, River Gash. Though the landscape of the area and the river’s width make the construction of this new bridge exceptionally difficult, Gedem and Debaisima construction companies strove hard to make this dream come true. The first step was clearing the water underneath where 12 motors were used and then laying the foundation which was 23 meters beneath the surface.
One central pole with a height of 24 meters and 9 meters width and two poles supporting the sides with a height of 88 meters and width of 9 meters and a third pole in the center with a height of at least 21 meters were prepared. The toughest part was lodging these poles and putting the side poles on top.
The 115 meter long, 12.5 meter wide and 21 meters tall, Tokombia Bridge was completed and will start rendering services in the near future. And both the construction company members and inhabitants of the region believe that this bridge will have a huge impact on the lives of the inhabitants of the region.
One of the towns that are going to benefit from this newly constructed bridge is the semi-urban Tokombia, which is located along the River Gash and is among the trading centers of the region. Before the construction of this bridge the town had been isolated from the rest of the region especially during rain seasons. Previously the inhabitants of the region used the traditional century-old bridge constructed during the Italian colonial era later in 2007, this old bridge was destroyed, which left this town isolated from the region but now with the construction of the bridge such troubles will be over.
The Tokombia Bridge is part of the various endeavors of the government to develop remote areas and will play a crucial role in enhancing the living standard of the inhabitants. This bridge is opening a new chapter not only in the lives of the inhabitants but in the construction of bridges around the country as well.